Ankerbold Road

CHALLENGE
To provide 4 adoptable attenuation tanks on a large housing development, some in difficult ares of the site..
APPROACH
With 4 tanks, we had to value engineer where possible & provide an irregular shaped tank in one difficult location.
SOLUTION
Collaboration from start to end of the design phase was key. Also being flexible & organised in scheduling production.